It is important to note, all measurements are from the final finished floor lever i.e. Insert the temporary spacers between the post and the pillar. They prevent deformation of the passage during installation. Insert the rail into the top horizontal bar (in-between the vertical pillars).įix the metal vertical post to the top rail. Screw the top horizontal part to the two vertical pillars.Ĭlip the remaining horizontal bars on both sides of the vertical pillars. Insert temporary polystyrene spacers between the horizontal bars so that the frame remains rigid during fixing of the plaster board. The assembly of the frame starts with the assembly of the main trunk:Īssemble the trunk parts by clipping the two vertical pillars to the horizontal bottom part.
#Pocket door installation install
Professional or handyman, you can install a sliding door successfully provided you follow certain rules. In this article, we will go through the assembly and installation process of Eclisse Pocket Door System. Increasingly popular, sliding doors more often find a place in your interior design. Unlike a traditional door, it slides into the partition and does not clutter the surface of the finished floor – the space is optimized in each of your rooms.